Projects

Guildford Road Bridge

In 2016 FCD undertook an extensive pile remediation project on the Guildford Road Bridge with Jomar Contracting. Work included pile encapsulation and grouting using two different product systems, pile wrapping with grease and marine tape products, installation and management of silt curtains and seabed excavation. This project required the management of marine traffic through a navigation span adjacent to the diving works in nil-visibility conditions. All works on this project were delivered on time and budget.